facebook-icotwitter-icogoogle-icorss-ico
connectsubscribearchives
Log in

Warning: Invalid argument supplied for foreach() in /home/rtmmemph/public_html/templates/gk_news2/html/com_content/article/default.php on line 13

2013 Fall Bridge Lift Begins Wednesday Morning

  • Written by The Chicago Defender
  • Published in Chicago
    n-FALL-BRIDGE-LIFT-large.jpg

    Photo credit: The Expired Meter

    The Expired Meter:

    Wednesday morning marks the first day of the city's annual fall bridge lift and drivers caught by a raised bridge should expect long waits.

    At 9:30 AM, just after the morning rush hour subsides, the Lake Shore Drive bridge will be raised to allow the season's first flotilla of sail boats to enter the Chicago River on their way to dry dock storage according to the Chicago Department of Transportation.

    Every Wednesday at 9:30 AM and Saturday mornings at 9, from late September through mid November, a pair of city bridge tenders raise the 27 movable bridges sequentially along the main and south branches of the river to allow these tall masted ships to pass without obstruction.

    Read the whole story at The Expired Meter

    Read more http://www.chicagodefender.com/index.php/news/city/25121-fall-bridge-lift-wednesday-morning

    Add comment


    Security code
    Refresh